Monday
& Tuesday:
![]() |
Inventory
sheet
|
The focus
of the last two days was inventory and receiving. On Monday, I was at Four
Lakes working with Cory. We did a lot of unloading pallets of food into their
proper places. While doing this we had to make sure everything that was ordered
was there and that the invoices matched up. I spent some time in the
refrigerators and freezer which were a little too cold for my liking. I
also did some inventory work at four lakes. I was given a sheet of the dry
products used in central production and had to write down what was left. He had
me input this information into CBORD which told us how much needs to be
ordered.
![]() |
The dreaded
freezer
|
Before
the lunch period started, there were some severe weather warnings. There was a
meeting to ensure everyone knew what to do in case of an emergency situation.
The safe zone for dining guests is in the downstairs bathroom and for employees
or people in the back of the house the basement is the safe zone.

I was
taking inventory at flamingo run in Gordon for the last hour of my shift. It is
a pretty time consuming process considering I only got ¼ of the store covered
while I was there.
Wednesday:


water to
make it cold enough to go into the warm freezer. It was a really cool process
but it took a while to get to the end product.
Thursday:

Later on
I met with Kevin Kontny (the chef working with Miranda and I on our theme
dinner), to go over some questions on the menu and create official recipes for
our new items. He also went through how he forecasts meals while I was there.
We worked on the recipe for our California dreamin’ pizza so we can start
testing it next week. We will also be testing out a recipe for an Elvis panini
with peanut butter, bacon, and banana.
Friday:


No comments:
Post a Comment